Next while the cement cured over the next 30 days, I tore down a big 20 foot long shelf on the right side of the garage as it blocked insulation and drywall which was the next project. Interesting enough the plastic bags holding the insulation bats sweated the floor in a few places that now have darker edges! I also had a hard time finding the insulation in our hardware and lumber supply chain stores. Gotta say the supply chain right now is pretty much not dependable.
With the shelf out insulation and some extra electrical sockets was next
No comments:
Post a Comment