All that was under old slab was sand and roots. The slab was literally less than than an inch thick in places and poured on top if sand. Another two days were digging down deeper and removing a bunch of fairly thick tree roots coming from my neighbors fig tree.
Then adding a base of packed gravel. followed by a water/vapor special plastic for cement, and rebar!